Kevin O'Leary's massive data center faces heat waste backlash
A proposed massive $70 billion data center backed by Kevin O'Leary faces a judicial review over concerns regarding its unprecedented thermal output.
Latest stories, in-depth analysis & breaking updates
A proposed massive $70 billion data center backed by Kevin O'Leary faces a judicial review over concerns regarding its unprecedented thermal output.
Olvondo Technology has developed a helium-driven industrial heat pump capable of generating simultaneous heating and cooling above 200°C.
Engineers at Lehigh University have built a 150 kWh concrete thermal battery capable of withstanding 500°C to capture and reuse data center waste heat.